Half-width transition from the banked wood road curve to flat RoadTech.
It keeps only the outer lane, from the centre line to the outer rim. The bank flattens out and the surface rises 2 m to meet a RoadTech straight placed two levels above the curve. The cut side is closed and there are no beams under the deck.
Placement: put it where the last banked curve block would go, at the curve's level. The Left version is the mirror image.